Investigations Reveal Scale of State-Backed Data Center Network Tied to Former Nvidia CEO Scandal
Public records and investigative findings detail how businessman Kang Wei built a multi-billion-dollar Chinese data center network while his wife cultivated ties with Nvidia leadership.
- Kang Wei built a data center network in China with proposed investments exceeding nine billion dollars between 2021 and 2024.
- Projects included a four point five billion dollar complex in Wuhu and a five billion dollar estimated development in Liangshan.
- Alice Huang utilized a Singapore-based firm to secure cloud partnership status and processor access from Nvidia.

Recent public records reviews and investigative reporting have brought attention to the parallel business activities of Chinese businessman Kang Wei and his wife, Alice Huang. Their endeavors intersected with key areas of the artificial intelligence sector, involving both advanced computing infrastructure in China and high-level technology access.
Corporate Structure and State Involvement
Kang's data center enterprise began taking shape in late 2021 through Shanghai-based developer Century Longteng. Regulatory filings from that period indicated that a local government body in Shanghai held a ten percent stake in the firm. An investment vehicle associated with Kang's primary private-equity venture, Hexi Capital, controlled a twenty-seven percent interest, while the remaining sixty-three percent belonged to Century Huatong, a Shenzhen-listed gaming conglomerate that diversified into infrastructure.
Kang subsequently assumed an executive position within Century Longteng. Early in 2022, the developer formed a partnership agreement with Huawei Technologies to collaborate on cloud infrastructure, energy systems, and computing operations. Kang participated in the formal signing ceremony alongside senior Huawei representatives, occurring after the telecommunications equipment provider had been placed on United States trade restriction lists.
Major Infrastructure Developments
Between 2021 and 2024, proposed investments associated with Kang's business network exceeded nine billion dollars, according to government announcements and corporate filings. One of the primary projects launched in the summer of 2022 in Wuhu, located in Anhui province. Planned as an intelligent-computing industrial park, the development carried an estimated investment of four point five billion dollars.
Designed to encompass approximately four point one million square feet across eight buildings, the Wuhu complex was engineered to house roughly 24,000 server racks. The site received local government assistance regarding electricity provisions and foundational infrastructure, aligning with national initiatives to shift computing workloads from eastern metropolitan centers to energy-abundant western regions. Registry records from April indicated that at least one building measuring about 500,000 square feet had been completed.
Expansion in Sichuan and Shenzhen
In July 2024, Kang participated in a groundbreaking ceremony for a subsequent major project in Liangshan, a remote region in Sichuan province. Local official accounts designated him as chairman of a data-services subsidiary linked to Century Longteng. This second initiative carried an estimated project cost of approximately five billion dollars, though construction progress and exact state funding figures were not established in public documentation. Corporate filings additionally connected the company's network to development activities in the southern technology hub of Shenzhen.
Parallel Channels and Leadership Changes
While Kang advanced domestic infrastructure ventures with state backing, Alice Huang pursued separate commercial interests through Megaspeed, a Singapore-registered entity. In November 2023, she informed Nvidia that e-commerce conglomerate Alibaba intended to serve as a major customer, a representation that secured Megaspeed status as an Nvidia cloud partner and priority access to advanced processors. Her directorship at Megaspeed concluded later that month amid ownership restructuring, though her association with then-Nvidia CEO Jensen Huang persisted.
Public scrutiny intensified after Jensen Huang acknowledged an extramarital relationship with Alice Huang in correspondence directed to corporate employees. The executive subsequently resigned from his position, and company chief financial officer Colette Kress assumed the role of interim CEO. While available documentation establishes that the couple operated on opposite sides of the technological divide between the United States and China, reporting indicates no verified evidence that Beijing directed Megaspeed's procurement activities or that restricted processors were routed into Kang's data center facilities.
- Century Longteng partnered with Huawei in early 2022 to develop cloud and energy infrastructure.
- The Wuhu computing park received local government support for electricity and infrastructure under national resource distribution strategies.
- Jensen Huang stepped down as CEO of Nvidia following disclosures regarding his relationship with Alice Huang.
Spotted an error? · Our editorial policy
UP NEXTSanjay Kapoor Stars in ‘Unexpected – Safed Sach’ Based on 2024 Dehradun CaseOther angles · #Artificial Intelligence
Timeline →- NewsAnthropic Researcher Claims AI-Assisted Proof for the Riemann Hypothesis
- NewsTrump Backs Jensen Huang’s Return to Nvidia Amid Board Resistance and Intelligence Scrutiny
- NewsTrump Discusses Nuclear Buildup and AI Safeguards Following Trilateral Summit with Xi and Putin
- NewsTrump Threatens Heavy Taxes on US Firms Constructing Data Centers Overseas
More from Technology

Anthropic Researcher Claims AI-Assisted Proof for the Riemann Hypothesis

Grand Theft Auto VI Becomes Largest Entertainment Launch in History

Trump Backs Jensen Huang’s Return to Nvidia Amid Board Resistance and Intelligence Scrutiny
