Empty Vande Bharat Train Travels 463 Kilometres With Isolated Brakes Prompting Formal Railway Probe
The South Eastern Railway zone has ordered an investigation after an empty Vande Bharat train completed a 463-kilometre journey with isolated coach braking systems despite repeated warnings from locomotive pilots.
- An empty Vande Bharat rake travelled 463 kilometres from Hatia to Jhansi on October 24 with isolated coach brakes.
- Locomotive pilots flagged poor brake performance in writing at Ranchi and verbally at Muri, but the train was permitted to proceed.
- The South Eastern Railway zone issued an investigation order on November 7 directing the Ranchi Divisional Railway Manager to probe multiple staff lapses.

An empty Vande Bharat chair car rake travelled a distance of nearly 463 kilometres across multiple states with its coach braking systems entirely isolated. The transit occurred on October 24 while the empty train was being transported from Hatia in Jharkhand to Jhansi in Uttar Pradesh using a freight locomotive.
Incident Timeline and Warnings
According to the official investigation order issued on November 7 by the South Eastern Railway zone, the freight locomotive was supposed to be properly integrated with the train's braking system. Shortly after departure from Hatia, the initial locomotive pilot conducted a standard brake power test and discovered that the braking performance was severely deficient. A written complaint was submitted upon reaching Ranchi station, yet the train was authorized to continue its journey regardless.
A second locomotive pilot who took charge of the rake at Muri station similarly alerted regional controllers. This crew member reported that brakes could not be engaged by dropping the brake pipe pressure. The train continued without effective coach brakes, relying entirely on the goods locomotive's brakes and regenerative capabilities until it finally reached Deen Dayal Upadhyaya station in the Chandauli district of Uttar Pradesh, where railway officials inspected the rake and uncovered the isolated braking configuration.
Preliminary Findings and Negligence
The South Eastern Railway zone directed the Divisional Railway Manager of Ranchi to conduct a comprehensive inquiry into the operational failures. A preliminary review pointed to widespread negligence involving coach and wagon maintenance personnel, section and traction controllers, and the operating train crews. Maintenance teams allegedly omitted physical verification of the brakes prior to departure, while operating staff reportedly lacked sufficient familiarity with the specific braking mechanisms of the Vande Bharat trainset.
- The journey occurred on October 24 using a freight locomotive to pull the empty chair car rake.
- Braking systems across all coaches were found isolated only upon reaching Deen Dayal Upadhyaya station.
- Preliminary findings highlighted failures by maintenance staff, controllers, and crew members unfamiliar with the train technology.
Spotted an error? · Our editorial policy
UP NEXTSanjay Kapoor Stars in ‘Unexpected – Safed Sach’ Based on 2024 Dehradun CaseSwipe more stories · IndiaQuick cards, a few lines each. Tap to open.More from India

Prime Minister Narendra Modi Visits IIT Kharagpur for Platinum Jubilee Celebrations

Ladakh Holds First Local Body Elections Since 2019 Reorganization

YouTuber Remanded to Prison Following Re-enactment of Madurai Jewellery Heist
