Empty Vande Bharat Train Traveled Hundreds of Kilometers With Isolated Brakes
An empty Vande Bharat train rake traveled 463 kilometers across multiple stations with isolated coach brakes before railway officials intervened.
- An empty Vande Bharat train traveled 463 km with isolated coach brakes on October 24.
- Loco pilots at Ranchi and Muri stations issued warnings about ineffective brake power, which were ignored by controllers.
- The South Eastern Railway zone ordered a detailed inquiry into staff negligence and braking system failures.

An empty Vande Bharat chair car rake traveled 463 kilometers from Jharkhand to Uttar Pradesh with its coach braking systems entirely isolated, prompting an official high-level inquiry. The October 24 journey involved moving the empty train from Hatia to Jhansi using a freight locomotive.
Ignored Warnings From Train Crew
Following departure from Hatia, the initial loco pilot performed a brake test and discovered that the stopping power was severely compromised. A formal written complaint was submitted at Ranchi station to the section controller and traction loco controller, yet the train was cleared to proceed without intervention. A second driver stationed at Muri subsequently reported that lowering brake pipe pressure failed to engage the train brakes, but controllers again permitted the journey to continue.
Inspection Discovery at DDU Station
Railway authorities at Deen Dayal Upadhyaya station in Chandauli district inspected the rake and discovered that the braking mechanism for every coach had been disconnected. Consequently, the train relied exclusively on the locomotive's independent brakes and regenerative capabilities for the majority of the trip. The South Eastern Railway zone formally categorized the event as a major safety violation that created significant operational risks.
Official Inquiry and Findings
An administrative order issued on November 7 instructed the Ranchi divisional railway manager to investigate staff negligence thoroughly. Preliminary findings indicated that maintenance personnel failed to verify physical brake integration prior to departure, and operating crews lacked familiarity with the specific braking architecture of the Vande Bharat equipment. Officials are reviewing the incident to establish accountability and implement preventive measures across the network.
- The journey involved moving an empty rake from Hatia in Jharkhand to Jhansi in Uttar Pradesh using a freight locomotive.
- The issue was only discovered and addressed when the train reached Deen Dayal Upadhyaya station in Uttar Pradesh.
- The South Eastern Railway ordered the Ranchi divisional manager to investigate multiple staff failures and improve safety protocols.
Spotted an error? · Our editorial policy
UP NEXTSarfaraz Khan Details Emotional Toll of Dressing-Room Leak Allegations and Gambhir’s SupportOther angles · #Indian Railways
Timeline →More from India

Prime Minister Narendra Modi Visits IIT Kharagpur for Platinum Jubilee Celebrations

Ladakh Holds First Local Body Elections Since 2019 Reorganization

YouTuber Remanded to Prison Following Re-enactment of Madurai Jewellery Heist
